Building S – Radboud hospital
H5S contributes to renovation of the Radboud hospital in Nijmegen with self-drilling anchors and micropiles
Commissioned by BodemBouw, H5S contributes to the renovation of the Radboud hospital in Nijmegen. Below building S, which will serve as the main part of the hospital a two layer basement is realized. After BodemBouw has installed the Cutter-Soilmix wall, H5S has installed the self-drilling anchors. Besides the anchors H5S also drilled the casing holes through the CSM-Wall.
Inside the building pit a tower crane is used which is founded on 16 micropiles that are also installed by H5S.
Because some anchors where at challenging positions the flexibility of the HFS-Sonic Drill Rig came at good use. This is displayed in the pictures below.